Financing and Execution the Project aimed at Organizing Minab Dam Downstream River

Financing and Execution the Project aimed at Organizing Minab Dam Downstream River

Minab downstream River is one of the important rivers in Hormozgan Province, that floats in Minab plain, in approximately 120 kilometer distance from east Bandar Abbas. Minab Dam has been built to harness the flood and provide sustained drinking and agricultural water in Dasht Minab region, as well as for supplying drinking water in Bandar Abbas City. The goal of this project is to organize, dredge and control Minab river flood.

Status of Project: In Progress

Project Highlights

Role of Parhoon Tarh: Contractor of Construction Operations, and Site Building
Project investor: Tana Energy and Parhoon Tarh Joint Venture
Client: Hormozgan Regional Water Company
Consultant Engineer: Sabzab Arvand Consultant Engineers Company
Location: Hormozgan Province- Minab City
Project Cost:790 billion IRR
Project Duration: 12 months

 

Project images

Project Volumes

Concrete work: 46,000  m3
Excavation: 902,000  m3
Embankment: 803,000  m3
Geotextile: 156,000  m3
Stone structures: 183,000  m3

Project Specification

Length of the right dike of the river: 7,880 m
Length of the left dike of the river: 6,790 m
Height of the dike: 3.5m , 4.5m and 5.5 m
Concrete pipes: 700 to 1000 mm diameter
Type of operations: River organizing
 

Project Goals

  • Building soil dike in the planned dimensions by using geotextile filter materials, construction of gable surface and pebbles in cement mortar for non-urban areas in the right and left banks of the river
  • Dikes heels protection operations including digging canals and pebble mortar filling in designed dimensions in 2.5m length
  • The drilling, dredging operations, collecting and discharging surface waters in the dikes’ back, and construction of dike underpass structures to direct the dredged water into the river
  • Collecting river materials for dike construction, and clearing the path of the last area (the lowest stream in the area).
post

Almar Afghanistan

Almaar Afghanistan

The contract of Almaar dam and irrigation network designing was signed in 2012 between Tedis company of Tajikistan (main contractor) and Arian Parhoon. Almaar project is 34 kilometers far Maimana city, Faryab province, Afghanistan. The project includes a 68-meter-high concrete gravity dam and irrigation network in an area of 4000 hectares.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Owner: Ministry of Water and Power in the Islamic Republic of Afghanistan
Client: Tedis (Tajikistan)
Location: Afghanistan, Faryab, Maimana
Project Cost: 1.55 million USD
Project Duration: 22 Months

 

Featured Images

Project Specification

Type of Dam: Gravity Dam
Length at the Crown: 350 m
Spillway: Free Spillway at the Crown
Drainage Network: 3995 Hectares

Project Goals

  • Providing water for downstream lands

Project Stakeholders