Shiraz Forsat Railway Station

Shiraz Forsat Railway Station


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Shiraz Urban Railway Organization
Consultant Engineer: Monenco Consulting Engineers
Location: Iran-Fars Province
Project Cost: 11 million USD
Project Duration: 16 months

 

Featured Images

Project Volumes

Concrete Volume: 19,000 m3
Formwork: 18,000 m2
Reinforcement: 2,900 tons
Steel Works: 760 tons
Piling: 1,220 m

Project Specification

Total Area: 7,000 m2
Method Statement: Bottom to Top

Project Goals

  • Development of urban railway plans in Shiraz city regarding the fundamental demands of public transformation

Project Stakeholders

post

Isfahan Takhti Railway Station

Isfahan Takhti Railway Station

Takhti station as one of the major stations of Isfahan urban railway plan is situated at the Takhti intersection in Isfahan. This contract was awarded to this company due to previous experiences in this field. Parhoon Tarh Co. is responsible for execution of all remained civil, electrical, and mechanical works of project as the main contractor.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Isfahan Urban Railway Organization
Consultant Engineer: Naghsh Jahan Talash Consulting Engineers
Location: Iran-Isfahan Province
Project Cost: 15 million USD
Project Duration: 24 months

 

Featured Images

Project Volumes

Concrete Volume: 19,000 m3
Formwork: 22,000 m2
Reinforcement: 1,500 tons
Steel Works: 190 tons

Project Specification

Total Area: 7,000 m2
Method Statement: Top to Bottom

Project Goals

  • Development of urban railway plans in Isfahan city regarding the fundamental demands of public transformation

Project Stakeholders

post

Shiraz Urban Railway Central Depot

Shiraz Urban Railway Central Depot

This central depot which is located in Shiraz city includes several buildings such as a view hall, a washing hall, an administration building, parking spaces, stores, power posts, etc. The whole work scopes of the contract including all civil, electrical, and mechanical activities were completely done by Parhoon Tarh Co. as the main contractor.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Shiraz Urban Railway Organization
Consultant Engineer: Itsen Consulting Engineers
Location: Iran-Fars Province
Project Cost: 7 million USD
Project Duration: 15 months

 

Featured Images

Project Volumes

Concrete Volume: 15,000 m3
Formwork: 20,000 m2
Reinforcement: 350 tons
Earth Works: 70,000 m3
Steel Works: 750 tons
Landscaping: 6,000 m2

Project Goals

  • Provision and extension of storage spaces for Shiraz railway project

Project Stakeholders

post

Isfahan Jaber Railway Station

Isfahan Jaber Railway Station

Jaber station as one of the main stations of Isfahan urban railway plan is situated in a space with some area about 4,000 m2. Architectural aspects of this station is designed in two floors including top floor as the ticket hall with equipment spaces and bottom floor in which platforms of stations and other equipment’s are located. Structure of this station is a combination of concrete wall in the bottom floor and a mat foundation where the top floor is executed on with a combination of concrete beams and columns. Parhoon Tarh Co., the main contractor, was responsible for execution of all civil, electrical, and mechanical works of the project.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Isfahan Urban Railway Organization
Consultant Engineer: Badband Consulting Engineers
Location: Iran-Isfahan Province
Project Cost: 7 million USD
Project Duration: 23 months

 

Featured Images

Project Volumes

Concrete Volume: 15,000 m3
Formwork: 25,000 m2
Reinforcement: 2,000 tons
Earth Works: 70,000 m3
Steel Works: 120 tons

Project Specification

Total Area: 7,000 m2
Method Statement: Open trenches excavation and provision of stability

Project Goals

  • Development of urban railway plans in Isfahan city regarding fundamental demands of public transformation

Project Stakeholders