Qeshm Combined Cycles Power Plant

Construction operations of Qeshm Combined Cycle Power Plant

Qeshm combined cycle power plant is built on 73 hectares of land in kilometer 18 Laft to Qeshm Road. The scope of the work included building a combined cycle block consisting of 2 gas units in 170 MW capacity, power plant substation in GIS type in 230 KW voltage level, and steam turbine in 160 MW capacity in the ISO (final 500 MW) conditions. The construction operations of the water intake of this power plant in 100 thousand cubic meter water intake capacity, the infrastructure, and pavement of the access roads in the gasfield are among the work objects of this project as well.

Status of Project: In Progress

Project Highlights

Role of Parhoon Tarh: Contractor of Construction Operations and Site Building
Client: Construction and development of MAPNA Combined Cycle Power Plant (Tosse 3)
Location: Hormozgan Province- Qeshm Island
Project Cost: 3,560 billion IRR
Project Duration: 20 months

 

Project images

Project Volumes

Concrete work: 71,000  m3
Excavation: 217,000  m3
Formwork: 105,000  m2
Reinforcement (armature): 6,200 T
Steel structures: 2,400 T
Embankment: 150,000  m3
Asphalt: 18,000  m2

Project Specification

Type of power plant: Combined cycle
Power plant capacity: 500 MW
Number of units: 2 gas units, one steam unit and water intake structure
 

Project Goals

  • Electricity generation and improving the environmental conditions

Isfahans Refinery

Utility and offsite units of isfahans refinery industrial buildings

Isfahan refinery has developed and upgraded the refinery in order to reduce the con­ sumption of refineries, increase gasoline and improve its quality to acceptable levels. The refinery promotion plan should look at the energy and environmental protection (environmental plan) and the reduction of production costs. We are constructing civil and piping parts of utility and offsite units in the project.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Contractor
Client: Oil Design & Construction Co. (ODCC)
Location: Iran-Isfahan Province
Project Cost(along with purchase & installation of cranes): 9.5 million USD
Project Duration: 7 Months

 

Featured Images

Project Volumes

Concrete Work: 30000 m3
Excavation: 180000 m3
Formwork: 30000 m2
Reinforcement: 3000000 Kg
GRV/GRE/GRP Piping Volume: 53,000 Dia-lnch

Project Specification

Civil and piping parts

of utility and offsite units

Project Goals

  • Reduce the consumption of refineries.
  • Increase gasoline and improve its quality to acceptable levels.

Project Stakeholders

post

Yazd Fruit and Vegetables Complex

Yazd Fruit and Vegetables Complex

This project includes procurement and execution of all civil, electrical, and mechanical work scopes related to phase F of Yazd fruit and vegetable complex which was awarded to this company after tender process. The whole project is divided into several amenities such as an administration, restaurants, eastern & western markets, one mosque, hotels, services, etc. mainly with steel structures. Parhoon Tarh co. is responsible for execution of all related civil works for phase F of the main plan.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Omran Maskan Sazeh Paydar Co.
Consultant Engineer: Saman Ofogh Kish Consulting Engineers
Location: Iran-Yazd Province
Project Cost: 15 million USD
Project Duration: 18 months

 

Featured Images

Project Volumes

Concrete Volume: 9,000 m3
Reinforcement: 800 tons
Formwork: 11,000 m2
Steel Works: 2,000 tons
Landscaping: 16,000 m2

Project Specification

Total Area of Buildings: 40,000 m2

Project Goals

  • Enhancing life facility and improving individual’s access to healthy foods, fresh fruits, vegetables, etc

Project Stakeholders

post

Pardis Sonbol Residential Complex

Pardis Sonbol Residential Complex

Pardis resindential complex project with capacity of 498 units considered as one the biggest plans of PHI Co. is located in some 25 km form east of Tehran in new city of Pardis. This project with the main purpose of housing a large number of people, benefits of the Stud Panel system which is well known for its light weight leading to lower costs and time. The earthquake resistance system is provided with shear walls by constructing a 3*5 concrete box around stairs leveled up to 20 meters. Parhoon Tarh Co. was responsible for execution of all civil works in the project including steel structure as well as concrete shafts.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Pardis Housing Investment Company
Consultant Engineer: Pardis Housing Investment Company
Location: Iran-Tehran Province
Project Cost: 7 million USD
Project Duration: 12 months

 

Featured Images

Project Volumes

Concrete Volume: 3,000 m3
Reinforcement: 500 tons
Formwork: 20,000 m2
Steel Works: 4,000 tons

Project Specification

Total Area of Buildings: 45,000 m2
Capacity: 498 units
Number of Blocks: 15

Project Goals

  • Provision of living accommodation

Project Stakeholders

post

Uma Oya Underground Excavation

Underground Excavation Uma Oya Sri Lanka

The Uma Oya Multipurpose development project is a water transfer, hydropower and irrigation project in the south-Eastern part of the central highland region of srilanka. The main part of the scheme is situated in the south-western part of the Badulla district in the province of Oya. The project will transfer annual long-term average water quantity of 145 mcm for irrigation purpose and will develop a head of a more than 700 m for the production of electricity in a power plant with rated capacity of about 120 mv. The Project Consists Of Two Rcc Dams. The Frist One is To Be Built on Uma Oya River at Puhulpola Region. The Water from Uma OyaRiverbe linked through an approximately 3.7 km long link tunnel (further called conveyance tunnel) into the reservoir of the dyraaba dam built on mahatotillaoya river. from where an approximately 15.2km long headrace tunnel and 595m high vertical shaft will convey water to the underground powerhouse. The discharge from the powerhouse will be directed into alikotaoya River Through an approximately 3.6 km long tailrace tunnel, Which Is a tributary of kirindiOya River.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Contractor
Client: Farab Company
Consultant Engineer: Mahab Ghodds Consultant
Location: Sri Lanka
Project Cost: 6 million USD
Project Duration: 10 months

 

Featured Images

Project Volumes

Concrete Volume: 2,000 m3
Reinforcement & Steel Works: 40 tons
Formwork: 500 m2
Excavation: 24,500 m3

Project Specification

Length of Tunnel: 750 m
VCA Tunnel Diameter: 2,55 m
LHT Tunnel Diameter: 2,15 m
LC Tunnel Diameter: 2,15 m

Project Goals

  • Construction of some spaces for installations and fittings in order to transfer water from Headrace Tunnel to Powerplant

Project Stakeholders

post

Uma Oya Headrace Tunnel

Hydropower Plant Tunnel Uma Oya Sri Lanka

The Uma Oya Multipurpose development project is a water transfer, hydropower and irrigation project in the south-Eastern part of the central highland region of srilanka. The main part of the scheme is situated in the south-western part of the Badulla district in the province of Oya. The project will transfer annual long-term average water quantity of 145 mcm for irrigation purpose and will develop a head of a more than 700 m for the production of electricity in a power plant with rated capacity of about 120 mv. The Project Consists Of Two Rcc Dams. The Frist One is To Be Built on Uma Oya River at Puhulpola Region. The Water from Uma OyaRiverbe linked through an approximately 3.7 km long link tunnel (further called conveyance tunnel) into the reservoir of the dyraaba dam built on mahatotillaoya river. from where an approximately 15.2km long headrace tunnel and 595m high vertical shaft will convey water to the underground powerhouse. The discharge from the powerhouse will be directed into alikotaoya River Through an approximately 3.6 km long tailrace tunnel, Which Is a tributary of kirindiOya River.


Status of Project: complete

Project Highlights

Role of Parhoon Tarh: Contractor
Client: Farab Company
Consultant Engineer: Amberg Engineers
Location: Sri Lanka
Project Cost: 36 million USD
Project Duration: 25 Months

 

Featured Images

Project Volumes

Concrete Volume: 1,000 m3
Excavation: 222,000 m3

Project Specification

Length of Tunnel: 15 km
Tunnel outer Diameter: 4.3 m
Tunnel inner Diameter: 3.8 m

Project Goals

  • Construction of Headrace Tunnel -15 Km Length- of the Uma Oya Multipurpose Development Project in Sri Lanka by mechanized method

Project Stakeholders

post

South Pars 13th Phase Laydown Roofed Warehouse & Landscaping

South Pars 13th Phase Laydown Roofed Warehouse & Landscaping

Construction of these warehouses was started with the objectives of storing equipment’s and materials close to the execution sites. Parhoon Tarh Co. was responsible for construction of all civil, architectural, electrical and mechanical works except steel structures.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: P.P.I (Petro Paidar Iranian) Co.
Consultant Engineer: P.P.I (Petro Paidar Iranian) Co.
Location: Iran-Bushehr Province
Project Cost: 5 million USD
Project Duration: 8 months

 

Featured Images

Project Volumes

Concrete Volume: 5,500 m3
Sandwich Panel: 25,000 m2

Project Specification

Number of Warehouses: 12,000 m2
Total Area: 18,000 m2
Height: 9 m

Project Goals

  • Provision of required warehouses for equipment’s and materials used in 13th phase of South Pars

Project Stakeholders

post

Twin Towers Telecommunication of Company of Iran

Twin Towers Telecommunication of Company of Iran

TCI company’s headquarters and subsidiaries is located in the North West Region of Tehran on the south side of Hemmat highway near by Sheikh Bahai Avenue . The project includes two 34 story towers and a multistory parking ,twin towers are exactly the same in structures and each one has 4 stories undergroud and 30 stories above. Among all experienced an reputable contractors Parhoon Tarh approved in the tender in June 2012 and was introduced as main contractor.


Status of Project: In Progress

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Iran Telecommunication Company
Consultant Engineer: Consulting engineers of planning and design
Location: Iran-Tehran Province
Project Cost: 2,800 Billion IRR
Project Duration: 36 months

 

Featured Images

Project Volumes

Stabilization: 13,000 m2
Piling: 19,000 meter
Concrete Works: 90,000 m2
Framework: 190 tons
Reinforcement: 75,000 tons
Anti-Fire Painting: 17,000 m2

Project Specification

Height of each Tower: 158 m from ground
No. of Floors for each Tower: 34
Type of Roofing: Metal Deck
Type of Structure: Steel Structure
Area of each Tower: 52,000 m2
Total Area: 196,000 m2

Project Goals

  • Providing office spaces, classes, document archives, stores, conference rooms, restaurants and other requirements of Telecommunication Company of Iran

Project Stakeholders

post

Shiraz Forsat Railway Station

Shiraz Forsat Railway Station


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Shiraz Urban Railway Organization
Consultant Engineer: Monenco Consulting Engineers
Location: Iran-Fars Province
Project Cost: 11 million USD
Project Duration: 16 months

 

Featured Images

Project Volumes

Concrete Volume: 19,000 m3
Formwork: 18,000 m2
Reinforcement: 2,900 tons
Steel Works: 760 tons
Piling: 1,220 m

Project Specification

Total Area: 7,000 m2
Method Statement: Bottom to Top

Project Goals

  • Development of urban railway plans in Shiraz city regarding the fundamental demands of public transformation

Project Stakeholders

post

Isfahan Takhti Railway Station

Isfahan Takhti Railway Station

Takhti station as one of the major stations of Isfahan urban railway plan is situated at the Takhti intersection in Isfahan. This contract was awarded to this company due to previous experiences in this field. Parhoon Tarh Co. is responsible for execution of all remained civil, electrical, and mechanical works of project as the main contractor.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Isfahan Urban Railway Organization
Consultant Engineer: Naghsh Jahan Talash Consulting Engineers
Location: Iran-Isfahan Province
Project Cost: 15 million USD
Project Duration: 24 months

 

Featured Images

Project Volumes

Concrete Volume: 19,000 m3
Formwork: 22,000 m2
Reinforcement: 1,500 tons
Steel Works: 190 tons

Project Specification

Total Area: 7,000 m2
Method Statement: Top to Bottom

Project Goals

  • Development of urban railway plans in Isfahan city regarding the fundamental demands of public transformation

Project Stakeholders