Dam 1 & 2 Akhtar Site Flood Control System


Gallery Pictures

Dam 1 & 2 Akhtar Site Flood Control SystemDam 1 & 2 Akhtar Site Flood Control SystemDam 1 & 2 Akhtar Site Flood Control SystemDam 1 & 2 Akhtar Site Flood Control System

Project Highlights

Role of Parhoon Tarh: Main contractor, member of Tablieh-Parhoon Tarh joint venture
Owner: Pars Oil & Gas Company
Location: Bushehr Province
Project Cost: 422,081,539,015
Project Duration: 24 Months

Project Volumes

Excavation & Rock Removal: 204,600 m3
Embankment (main frame execution): 897,600 m3

Project Specification

Type of Dam: Gravel (rock fill) with concrete coating (CFRD)
Length of the dam crown D1: 231 meters
Length of the dam crown D2: 172.4 meters
Dam height D1: 22 meters
Dam height D2: 50 meters

Project Goals

Protection of the downstream facilities of South Pars Phases 13, 22, & 24, against the destructive floods