Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Tablieh-Parhoon Tarh J.V.
Client: Afghanistan-Ministry Of Energy & Water
Consultant Engineer: Alborz Sazeh Consultant Engineers
Location: Afghanistan-Kabul
Project Cost: 48 million USD
Project Duration: 55 Months

Project Volumes

Dam Concrete Volume: 333,000 m3
Excavation Volume in Rock: 80,000 m3
Access Road Length: 6 Km

Project Specification

Dam Type: RCC (Roller Compacted Concrete)
Dam Crest Length: 303 m
Type of Spillway: Free Spillway on Dam Crest
Annual Production: 3.60 GWH/year

Project Goals

Agricultural land extension of 2,800 hectares Flood control and prevention of resulting damages | Power production of 1.2 MW
Increasing the groundwater level