Erection of Equipment For MEG Unit
M.E.G Mono ethylene project as one of the (main) plans of Jam petrochemical complex is located in Assaluyeh. Basic engineering & designing of this project was executed by Takni Mont Company, while final design and procurement was completed by Pidec-Takni Mont J.V. Erection of mechanical equipment’s of this complex was awarded to Naft Gostare Gheshm Co. as main contractor. Parhoon Tarh Co. as full authorized representative of main contractor was responsible for managing of execution process.
Status of Project: Completed
Project Highlights
Role of Parhoon Tarh: Construction Manager (CM)
Owner: Naft Gostare Gheshm (Main contractor as client)
Client: National Petrochemical Industries co.
Location: Iran-Bushehr province
Project Cost: 15 millions USD (Main contract) 1 million USD (Parhoon Tarh portion)
Project Duration: 14 months

Featured Images
Project Volumes
Equipments & Materials: 15,800 tons
Steel Structures: 2,000 tons
Above Ground Piping: 200,000 dia-inches
Electrical Cabling: 241 km
I&C Cabling: 181.5 km
Painting: 72,295 m2
Project Goals
- Directing floods
- Annual production of 400,000 tons of mono ethylene