Construction and civil operations of Setareh Sabz-e Siraf Refinery

Construction and civil operations of Setareh Sabz-e Siraf Refinery

Industrial buildings and civil engineering of Setareh Sabz-e Siraf Refinery Civil and construction operations of Setareh Sabz-e Siraf Refinery in Areas one and two, located in Asalouyeh of South Pars field, declared to this company through tender by Setareh Sabz-e Siraf Refinery Company in December 2020.


Current status of the project: Under construction

Key information of the project

Role of Parhoon Tarh: Main contractor
Employer: Setareh Sabz-e Siraf Refinery Company
Consultant: Nargan Consultant Engineers Company
Location: Hormozgan Province
Value of the project: 3500 billion Rials
Length of the projects: 12 months

 

Project images

Volumes of the projects:

Excavation: 600,000 cubic meters
Embankment: 300,000 cubic meters
Armature: 9000 tons
Concrete pouring: 80,000 cubic meters
Concrete molds: 300,000 square meters
Fence: 160 tons
Stone masonry: 15,000 cubic meters
Prefabricated buildings: 5,000 square meters

Technical descriptions of the project

Construction of refinery with capacity of 120,000 barrels of gas distastes
 

Project goals:

  • Preventing raw sales, creating added value, job creation and maximized production of South Pars Gas
 

Construction and installation operations of the new Khoramdasht detergent factory

Construction and installation operations of the new Khoramdasht detergent factory

Construction and civil operations and electrical and mechanical installations of the northern and middle sectors of the construction project of the new detergent factory in Khoramdasht Industrial City- Takestan- Qazvin in May 2020, assigned to Parhoon Tarh Company by Pakan Beh Shoo Company via tender.


Current status of the project: Under construction

Key information of the project:

Role of Parhoon Tarh: Main contractor
Employer: Pakan Beh Shoo Company
Consultant: Zharf Andishan Consultant Engineers Company
Location: Khoramdasht Industrial City- Qazvin
Value of the project: 1260 billion Rials
Length of the projects: 11 months

 

Project images

Volumes of the projects:

Concrete pouring: 16,000 cubic meters
Armature: 1000 tons
Concrete molds: 12,000 square meters
Steel deck: 88 tons
Ceramic tiles: 22,000 square meters
Sandwich panels: 48,000 square meters

Technical descriptions of the project:

Production and liquid packaging building: 22,000 square meters
Gel pod production and packaging building: 830 square meters
Industrial liquids production and packaging building: 600 square meters
Toothpaste production and packaging building: 2400 square meters
Sulfonation building: 4700 square meters
Product warehouse: 16000 square meters
Passage and power posts: 450 square meters
Engine room: 1100 square meters
 

 

Goals of the project:

  • Construction of a detergent factory with annual capacity of 420,000 tons, including laundry detergents, dishwashing liquids, toothpaste, glass cleaner etc.
 

Astara Grain Terminal Construction

Astara Grain Terminal Construction

Construction and civil operations and installations of the Astara Grain Terminal in April 2019, from Astara Ghaleh Azari Company to Parhoon Tarh Company.

Astara Grain Terminal is being constructed with capacity of 30,000 tons at the primary phase and 30,000 tons in the second expansion phase, located at the Astara Customs Grand Complex with investments from I.R.I. Railways and private foreign investment (Russian-Azerbaijani firm).

Construction of all administrative, storage, station, loading and unloading, firefighting, respective concrete reservoir, trans and laboratory buildings, installation of 470 units of 25 meter candles, concrete foundation for silos, landscaping and greenery and among the executive operations of the project.


Current status of the project: Under construction

Key information of the project:

Contractor: Collaboration between Parhoon Tarh- Tana Energy as chief contractor
Employer: Astara Ghaleh Azari Company
Consultant: Pasilo Consultant Engineers from Iran- INNOPRO Consultation from Azerbaijan
Location of the project: Mazandaran Province- City of Astara
Value of the contract: 2,800,000 Euros
Length of the contract: 31 months

 

Project images

Major volumes of the project:

Overall volume of concrete pouring: 20,000 cubic meters
Overall volume of soil works: 65,000 cubic meters
Armatures: 1,900
Concrete candles: 470 units with depth of 25 meters

 

Goals of the project:

  • Astara Grain Terminal was constructed based on the domestic need for increase of commerce and establishment of depots for imported grains at border regions.
 
post

Caspian Pipe Plant Complex

Caspian Pipe Plant Complex

Industrial manufacturing company Caspian Pipe Plant Complex with industry trends polyethylene water pipe From size 16 to 630 mm and pipe production of gas from size 25 to 225 mm.Caspian pipe Tabaerstan Co, an industrial manufacturer and a leader in Polyethylene production in the country takes pride for its decade of activity to benefit from expert knowledge of engineers , personnel and international technologies to produce Polyethylene water and gas pipes, thus to be a part of glorious and mighty Iranian industry.Our reputable company is actively involved in production of specialized Polyethylene pipes under commercial name of Caspian Pipe in Industrial city of Jouybar in Mazandaran state.


Status of Project: In Progress

Project Highlights

Role of Parhoon Tarh: Contractor for complete execution of executive activities
Client:Personal investor
Location: Mazandaran Province
Equipment Cost:300.000.000.000 Rial
Project Cost:1.000.000 Euro
Project Duration: 18 Months

 

Featured Images

Project Volumes

Concrete Work: 850 m3
Excavation: 717 m3
Formwork: 1526 m2
Reinforcement: 57398 Kg
Sandwich Panel: 8670 m2
Steel Structures: 652800 Kg

Project Goals

  • industry trends polyethylene water pipe From size 16 to 630 mm and pipe production of gas from size 25 to 225 mm

Project Stakeholders

Isfahans Refinery

Utility and offsite units of isfahans refinery industrial buildings

Isfahan refinery has developed and upgraded the refinery in order to reduce the con­ sumption of refineries, increase gasoline and improve its quality to acceptable levels. The refinery promotion plan should look at the energy and environmental protection (environmental plan) and the reduction of production costs. We are constructing civil and piping parts of utility and offsite units in the project.


Status of Project: In Progress

Project Highlights

Role of Parhoon Tarh: Contractor
Client: Oil Design & Construction Co. (ODCC)
Location: Iran-Isfahan Province
Project Cost(along with purchase & installation of cranes): 9.5 million USD
Project Duration: 7 Months

 

Featured Images

Project Volumes

Concrete Work: 30000 m3
Excavation: 180000 m3
Formwork: 30000 m2
Reinforcement: 3000000 Kg
GRV/GRE/GRP Piping Volume: 53,000 lnch-Dia

Project Specification

Civil and piping parts

of utility and offsite units

Project Goals

  • Reduce the consumption of refineries.
  • Increase gasoline and improve its quality to acceptable levels.

Project Stakeholders

post

South Pars 13th Phase Laydown Roofed Warehouse & Landscaping

South Pars 13th Phase Laydown Roofed Warehouse & Landscaping

Construction of these warehouses was started with the objectives of storing equipment’s and materials close to the execution sites. Parhoon Tarh Co. was responsible for construction of all civil, architectural, electrical and mechanical works except steel structures.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: P.P.I (Petro Paidar Iranian) Co.
Consultant Engineer: P.P.I (Petro Paidar Iranian) Co.
Location: Iran-Bushehr Province
Project Cost: 5 million USD
Project Duration: 8 months

 

Featured Images

Project Volumes

Concrete Volume: 5,500 m3
Sandwich Panel: 25,000 m2

Project Specification

Number of Warehouses: 12,000 m2
Total Area: 18,000 m2
Height: 9 m

Project Goals

  • Provision of required warehouses for equipment’s and materials used in 13th phase of South Pars

Project Stakeholders

post

Erection of Equipment For MEG Unit

Erection of Equipment For MEG Unit

M.E.G Mono ethylene project as one of the (main) plans of Jam petrochemical complex is located in Assaluyeh. Basic engineering & designing of this project was executed by Takni Mont Company, while final design and procurement was completed by Pidec-Takni Mont J.V. Erection of mechanical equipment’s of this complex was awarded to Naft Gostare Gheshm Co. as main contractor. Parhoon Tarh Co. as full authorized representative of main contractor was responsible for managing of execution process.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Construction Manager (CM)
Owner: Naft Gostare Gheshm (Main contractor as client)
Client: National Petrochemical Industries co.
Location: Iran-Bushehr province
Project Cost: 15 millions USD (Main contract) 1 million USD (Parhoon Tarh portion)
Project Duration: 14 months

 

Featured Images

Project Volumes

Equipments & Materials: 15,800 tons
Steel Structures: 2,000 tons
Above Ground Piping: 200,000 dia-inches
Electrical Cabling: 241 km
I&C Cabling: 181.5 km
Painting: 72,295 m2

Project Goals

  • Directing floods
  • Annual production of 400,000 tons of mono ethylene

Project Stakeholders

post

Ilam Cement Extension Project

Ilam Cement Extension Project

Located in 15 km from Sar Abeleh city, construction of concrete silos of Ilam cement production line was managed by Parhoon Tarh Co. Due to the fact that progress of the project was limited because of various prevailing social conditions, thorough an agreement with the National Construction Company (Main Contractor), Parhoon Tarh Co. was appointed as construction management of 5 silos including clinker, raw material, and bypass silos. Fortunately civil works of all 5 silos have been managed in 7 months with great quality.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Construction Manager (CM)
Client: Ilam cement company (Owner) National Construction Company (Main contractor as client)
Consultant Engineer: Sazeh Andishan Consulting Engineers
Location: Iran-Ilam Province
Project Cost: 16 millions USD (Main contract) 1 million USD (Parhoon Tarh portion)
Project Duration: 24 months

 

Featured Images

Project Volumes

Concrete Volume: 52,000 m3
Formwork: 94,000 m2
Reinforcement: 7,000 tons
Steel Works: 3,100 tons
Excavation: 190,000 m3

Project Specification

Number of Silos: 5 Units

Project Goals

  • Providing the sufficient spaces for storing of cement

Project Stakeholders

post

Construction & Civil Works of Light Polyethylene Plant Structures and Facilities

Construction & Civil Works of Light Polyethylene Plant Structures and Facilities

A unit of “Tenth Olefin”, Assaluyeh Linear low-density polyethylene (L.L.D.P.E) is situated in Assaluyeh port, Jam petrochemical. This unit presents capacity of 300,000 tons for Polymeric materials production. Parhoon Tarh Co. was responsible for managing of this contract as the project manager and also full authorized representative of client.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Construction Manager (CM)
Owner: Jam PCC
Client: Naft Gostar Gheshm Co.
Location: Iran-Bushehr province
Project Cost: 15 million USD (Main Contract), 1 million USD (Parhoon Tarh Portion)
Project Duration: 30 months

 

Featured Images

Project Volumes

Concrete Volume: 31,000 m3
Formwork: 64,000 m2
Reinforcement: 3,250 tons
Piping: 19,000 m
Base and Sub Base Material: 12,000 m3
HVAC Equipment: 10 units

Project Goals

  • Assaluyeh light linear Polyethylene plant is one of the ten largest Olefin plants in the world which produces 300,000 tons of polymers per annum

Project Stakeholders

post

Civil Works for Roadways of the 1st Phase of PCC

Civil Works for Roadways of the 1st Phase of PCC

This project is of great importance to define. The main features of the project consist of: directing floods, routing and locating main feed pipes of petrochemical units, providing access roads and entrances for various Petrochemical Units, as well as execution of heavy concrete structures including bridges, water ways, and retaining walls along with the subsidiary activities such as large excavations and associated minor parts. On the grounds that Tablieh Co., main contractor, had been aware of Parhoon Tarh Co.’s strengths, they introduced one of the board members of Parhoon Tarh Co. as full authorized representative. Fortunately, Parhoon Tarh Co. had a great performance in this project in that could achieve employers’ satisfaction. Consequently, Tablieh Co. stated that “despite the complexity and the special status of this project, structures distribution, frequent changes of plans, and lack of traffic restrictions in Assaluyeh operations, Parhoon Tarh Co. not only successfully accomplish all civil works, but also go well beyond the expected content of agreement.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Construction Manager (CM)
Owner: National Petrochemical Industries Company
Client: Tablieh Co.
Location: Iran-Bushehr Province
Project Cost: 15 million USD (Main Contract) , 1 million USD (Parhoon Tarh Portion)
Project Duration: 32 months

 

Featured Images

Project Volumes

Concrete Volume: 60,000 m3
Formwork: 100,000 m2
Reinforcement: 7,000 tons
Earth Works: 700,000 m3

Project Goals

  • Directing floods
  • Routing and locating the main feed pipes
  • Provision of access roads and entrances

Project Stakeholders