Caspian Pipe Plant Complex

Caspian Pipe Plant Complex

Industrial manufacturing company Caspian Pipe Plant Complex with industry trends polyethylene water pipe From size 16 to 630 mm and pipe production of gas from size 25 to 225 mm.Caspian pipe Tabaerstan Co, an industrial manufacturer and a leader in Polyethylene production in the country takes pride for its decade of activity to benefit from expert knowledge of engineers , personnel and international technologies to produce Polyethylene water and gas pipes, thus to be a part of glorious and mighty Iranian industry.Our reputable company is actively involved in production of specialized Polyethylene pipes under commercial name of Caspian Pipe in Industrial city of Jouybar in Mazandaran state.

Status of Project: In Progress

Project Highlights

Role of Parhoon Tarh: Contractor for complete execution of executive activities Client:Personal investor Location: Mazandaran Province Equipment Cost:300 billion Rials Project Cost:1 million euros Project Duration: 18 Months

 

Featured Images

Project Volumes

Concrete Work: 850  m3 Excavation: 717  m3 Formwork: 1,526  m2 Reinforcement: 57 T Sandwich Panel: 8,670  m2 Steel Structures: 653 T

Project Goals

  • industry trends polyethylene water pipe From size 16 to 630 mm and pipe production of gas from size 25 to 225 mm

Project Stakeholders

post

Hendurabi Airport

Hendurabi Airport

The geographic location of this Hendurabi project is 22.8 square kilometers, 325 kilometers from Bandar Abbas. According to a comprehensive study of the island, the total capacity of the island is 8065, which includes 3,165 islanders and 800 people. The daily number of 4100 passengers travels to the island and a number of passengers travel by air daily.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Contractor
Client:Jahad Nasr company
Consultant: Emen rah company
Location: Hendurabi Island
Project Duration: 30 Months

 

Featured Images

Project Specification

Band: 25-07
Airport Security Fence: 90 Hectare
Band Width: 30 meters and shoulder path 5 and 7 meters.over run 90 and 60 meters in the Respectively East and West side.
Band Lenght: 1480 meters Sit up and take off the air plane ATR72 AND F50.
Taxi Way: vertical taxi way with a length of 212 meters and a width of 18 meters plus a shoulder 5 and 7 meters.
Apron: Dimensions 80 × 140 m plus 5 and 7 m shoulders with the position of 3 stations for air planes ATR72.
Helipad: 2 station locations for the chopper.
Asphalt: Pouring asphalt in the runway
Lighting:lighting the band,taxi ways and apron.

Project Goals

The construction of the airport for faster and easier transfer of domestic and foreign specialists

Project Stakeholders

post

Persian Gulf Airport

Persian Gulf Airport

The geographic location of the Persian Gulf Airport Project is located 16 kilometers south-east of Bushehr Province. This airport is one of the most equipped passenger stations. Other statistics on the airport are the fact that 60 to 80 planes and helicopters, also known as Sorti, are known as airport highlights.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Contractor
Client: Navrood company
Consultant: Emen rah company
Location: Iran-Bushehr Province
Project Duration: 30 Months

 

Featured Images

Project Specification

Band: 31-13
Airport Security Fence: 700 Hectare
Band Width: 45 meters and shoulder path 5 and 7 meters.over run 120 meters in the Respectively East and West side.
Band Lenght: 4000 meters Sit up and take off the air plane B747.
Taxi Way: Parallel 4200 meters long and 4 vertical taxi way with a length of 212 meters and a width of 30 meters plus a shoulder 5 and 7 meters.
Apron: Dimensions 150 × 400 m plus 5 and 7 m shoulders with the position of 7 stations for flat planes.
Helipad: 4 station locations for the chopper.
Asphalt: Pouring asphalt in the runway
Lighting: CatII lighting the band and taxi ways.Navigational devices ILS AND DVOR.

Project Goals

The construction of the airport for faster and easier transfer of domestic and foreign specialists

Project Stakeholders

post

Qeshm Combined Cycles Power Plant

Construction operations of Qeshm Combined Cycle Power Plant

Qeshm combined cycle power plant is built on 73 hectares of land in kilometer 18 Laft to Qeshm Road. The scope of the work included building a combined cycle block consisting of 2 gas units in 170 MW capacity, power plant substation in GIS type in 230 KW voltage level, and steam turbine in 160 MW capacity in the ISO (final 500 MW) conditions. The construction operations of the water intake of this power plant in 100 thousand cubic meter water intake capacity, the infrastructure, and pavement of the access roads in the gasfield are among the work objects of this project as well.

Status of Project: In Progress

Project Highlights

Role of Parhoon Tarh: Contractor of Construction Operations and Site Building
Client: Construction and development of MAPNA Combined Cycle Power Plant (Tosse 3)
Location: Hormozgan Province- Qeshm Island
Project Cost: 3,560 billion IRR
Project Duration: 20 months

 

Project images

Project Volumes

Concrete work: 71,000  m3
Excavation: 217,000  m3
Formwork: 105,000  m2
Reinforcement (armature): 6,200 T
Steel structures: 2,400 T
Embankment: 150,000  m3
Asphalt: 18,000  m2

Project Specification

Type of power plant: Combined cycle
Power plant capacity: 500 MW
Number of units: 2 gas units, one steam unit and water intake structure
 

Project Goals

  • Electricity generation and improving the environmental conditions

Isfahans Refinery

Utility and offsite units of isfahans refinery industrial buildings

Isfahan refinery has developed and upgraded the refinery in order to reduce the con­ sumption of refineries, increase gasoline and improve its quality to acceptable levels. The refinery promotion plan should look at the energy and environmental protection (environmental plan) and the reduction of production costs. We are constructing civil and piping parts of utility and offsite units in the project.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Contractor
Client: Oil Design & Construction Co. (ODCC)
Location: Iran-Isfahan Province
Project Cost(along with purchase & installation of cranes): 9.5 million USD
Project Duration: 7 Months

 

Featured Images

Project Volumes

Concrete Work: 30000 m3
Excavation: 180000 m3
Formwork: 30000 m2
Reinforcement: 3000000 Kg
GRV/GRE/GRP Piping Volume: 53,000 Dia-lnch

Project Specification

Civil and piping parts

of utility and offsite units

Project Goals

  • Reduce the consumption of refineries.
  • Increase gasoline and improve its quality to acceptable levels.

Project Stakeholders

post

Yazd Fruit and Vegetables Complex

Yazd Fruit and Vegetables Complex

This project includes procurement and execution of all civil, electrical, and mechanical work scopes related to phase F of Yazd fruit and vegetable complex which was awarded to this company after tender process. The whole project is divided into several amenities such as an administration, restaurants, eastern & western markets, one mosque, hotels, services, etc. mainly with steel structures. Parhoon Tarh co. is responsible for execution of all related civil works for phase F of the main plan.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Omran Maskan Sazeh Paydar Co.
Consultant Engineer: Saman Ofogh Kish Consulting Engineers
Location: Iran-Yazd Province
Project Cost: 15 million USD
Project Duration: 18 months

 

Featured Images

Project Volumes

Concrete Volume: 9,000 m3
Reinforcement: 800 tons
Formwork: 11,000 m2
Steel Works: 2,000 tons
Landscaping: 16,000 m2

Project Specification

Total Area of Buildings: 40,000 m2

Project Goals

  • Enhancing life facility and improving individual’s access to healthy foods, fresh fruits, vegetables, etc

Project Stakeholders

post

Pardis Sonbol Residential Complex

Pardis Sonbol Residential Complex

Pardis resindential complex project with capacity of 498 units considered as one the biggest plans of PHI Co. is located in some 25 km form east of Tehran in new city of Pardis. This project with the main purpose of housing a large number of people, benefits of the Stud Panel system which is well known for its light weight leading to lower costs and time. The earthquake resistance system is provided with shear walls by constructing a 3*5 concrete box around stairs leveled up to 20 meters. Parhoon Tarh Co. was responsible for execution of all civil works in the project including steel structure as well as concrete shafts.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Pardis Housing Investment Company
Consultant Engineer: Pardis Housing Investment Company
Location: Iran-Tehran Province
Project Cost: 7 million USD
Project Duration: 12 months

 

Featured Images

Project Volumes

Concrete Volume: 3,000 m3
Reinforcement: 500 tons
Formwork: 20,000 m2
Steel Works: 4,000 tons

Project Specification

Total Area of Buildings: 45,000 m2
Capacity: 498 units
Number of Blocks: 15

Project Goals

  • Provision of living accommodation

Project Stakeholders

post

National Customs Academy of Kabul

National Customs Academy of Kabul

National Customs Academy in Kabul, Afghanistan project aims to organize the customs service in Afghanistan as well as personnel training. This project is financed by Europe Union. After being qualified in both experience and technical criteria. Parhoon Tarh took part in the biding process and due to its highlighted history in similar project and financial proposal has achieved the award of this project. Parhoon Tarh is Responsible for of all structural, architectural, mechanical and electrical design of the project.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: The European Union.
Consultant Engineer: Sim S.pA Co.
Location: Afghanistan-Kabul Province
Project Cost: 3 Million Euro
Project Duration: 18 months

 

Featured Images

Project Volumes

Excavation: 7,000 square feet
Concrete Works: 2,000 square feet
Frame Working: 11,000 square feet
Steel Works: 3 tons
Reinforcement: 110 tons
Landscaping: 8,000 square feet

Project Specification

Total Area of Administrative Buildings: 600 m2
Total Area of Didactic Buildings: 1600 m2
Type of Structure: Concrete Structure

Project Goals

  • Organization and training of Customs Service personnel in Afghanistan

Project Stakeholders