post

Mes Sarcheshmeh WTP Diversion Dam & Pumping Station

Mes Sarcheshmeh WTP Diversion Dam & Pumping Station

Industrial water partial demand of Mes Sarcheshmeh complex persuaded client to plan the construction of a water treatment plant with capacity of 500 litr/s. Water transmission from Rafsanjan Shur River was executed by a diversion dam and related treatment system. This J.V was responsible for design, construction, operation and maintenance of all related civil and electromechanical works which fulfilled client satisfaction.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Parhoon Tarh-Tool Gostar-Alfasam J.V.
Client: National Iranian Copper Industries co.
Consultant Engineer: Jooyabnou Consulting Engineers
Location: Iran-Kerman Province
Project Cost: 15 million USD
Project Duration: 36 months

 

Featured Images

Project Volumes

Concrete Volume: 16,000 m3
Formwork: 38,000 m2
Earth Works: 90,000 m3

Project Specification

Capacity of WTP: 500 litr/s
Pumping Station: 2 units
Pipeline: 5 km (600 mm diam.)
Diversion Dam: 3 m Height & 25 m width

Project Goals

  • Environmental protection
  • Supplement of industrial water through treatment of Shur river water and industrial waste water

Project Stakeholders