Parhoon Tarh

Parhoon Tarh

Building everything that is far from imagined

Menu
Skip to content
  • Home
  • Projects
    • Dams
      • Rais Ali Delvari
      • Shah Wa Arous
      • Akhtar Site
      • Chamshir
      • Khersan III
      • Almmar
      • Financing and Execution the Project aimed at Organizing Minab Dam Downstream River
    • Buildings
      • Telecom Twin Towers
      • Malard Laleh Complex
      • Kabul’s Custom
      • Pardis Sonbol Complex
      • Yazd Fruits Complex
    • Industrial Buildings
      • PGSOC Refinery
      • Phase13 Industrial Buildings
      • Navard Varagh Ahwaz
      • Phase13 Camp Structures
      • Phase13 Underground Works
      • PCC Roadways
      • Jam Petrochemicals L.L.D.P.E
      • Ilam Cement Extension
      • MEG Equipments Erection
      • Phase13 Warehouses
      • Isfahans Refinery
      • Caspian Pipe Plant Complex
      • Astara Grain Terminal Construction
      • Construction and installation operations of the new Khoramdasht detergent factory
      • Construction and civil operations of Setareh Sabz-e Siraf Refinery
      • Industrial Buildings and Site Construction of Negin Mahestan Petrochemical Company
    • Treatment Plants
      • Sarcheshmeh WTP
    • Power Plants
      • Seymareh Hydroelectric Plant
      • Aliabad Gas Power Plant
      • Abadan Gas Power Plant
      • Sanandaj Combined Cycle
      • Neka Combined Cycle
      • Rudeshur Simple Cycle
      • Yazd Solar Thermal
      • Sanandaj Cooling Towers
      • Yazd Farab Cooling Tower
      • Caspian Combined Cycles
      • Kashan Combined Cycles
      • Qeshm Combined Cycles
      • Construction Operations for Rehabilitating the Cooling System of Unit 5 Eslamabad Power Plant of Esfahan
      • Construction of Combined Cycle Power Plant of Mobarakeh Esfahan Steel Plant
      • Construction operations of concrete cooling tower of Latakia Combined Cycle Power Plant
    • Renewable Energies
      • Kuhin wind power plant
      • Jirandeh wind power plant
    • Tunnels and Roads
      • Isfahan 230 KV Cable Tunnel
      • Access Road to Seymareh
      • Uma Oya Headrace Tunnel
      • Uma Oya Underground
    • Urban Railway
      • Isfahan Jaber Station
      • Shiraz Central Depot
      • Isfahan Takhti Station
      • Shiraz Forsat Station
    • Airports
      • Persian Gulf
      • Hendurabi
  • Business development
    • Introduction
    • Market Research Analysis
    • Economic Investment Assessment
  • About us
    • About us
    • CEO Message
    • Members of Board
    • Awards and Certificates
    • HSE Policy
    • CV
    • QC Policy
  • Contact us
  • Careers
post

Posted on December 19, 2017 by mirarab
This entry was posted in Special. Bookmark the permalink.

Be connected with us

Email: Info@Parhoon-Tarh.Com

Links

  • Project Technical Information System (PTIS)
  • Office Automation
  • CV
  • Attendance system
  • Supplementary Insurance

Head Office

Address: No. 7,14th Alley, Pakistan st,shahid Beheshti st,Tehran, Iran

Tel: 021-83806
Fax: 021-88535425
P.Code: 1531764511

Copyright © 2023 PARHOON TARH, All rights reserved.
Powered by: Parhoon Tarh