Construction and civil operations of Setareh Sabz-e Siraf Refinery

Construction and civil operations of Setareh Sabz-e Siraf Refinery

Industrial buildings and civil engineering of Setareh Sabz-e Siraf Refinery Civil and construction operations of Setareh Sabz-e Siraf Refinery in Areas one and two, located in Asalouyeh of South Pars field, declared to this company through tender by Setareh Sabz-e Siraf Refinery Company in December 2020.


Current status of the project: Under construction

Key information of the project

Role of Parhoon Tarh: Main contractor
Employer: Setareh Sabz-e Siraf Refinery Company
Consultant: Nargan Consultant Engineers Company
Location: Hormozgan Province
Value of the project: 4,260 billion Rials
Length of the projects: 12 months

 

Project images

Volumes of the projects:

Excavation: 600,000  m3
Embankment: 300,000  m3
Armature: 9000 tons
Concrete pouring: 80,000  m3
Concrete molds: 300,000  m2
Fence: 160 tons
Stone masonry: 15,000  m3
Prefabricated buildings: 5,000  m2

Technical descriptions of the project

Construction of refinery with capacity of 120,000 barrels of gas distastes
 

Project goals:

  • Preventing raw sales, creating added value, job creation and maximized production of South Pars Gas
 
post

Construction and installation operations of the new Khoramdasht detergent factory

Construction and installation operations of the new Khoramdasht detergent factory

Construction and civil operations and electrical and mechanical installations of the northern and middle sectors of the construction project of the new detergent factory in Khoramdasht Industrial City- Takestan- Qazvin in May 2020, assigned to Parhoon Tarh Company by Pakan Beh Shoo Company via tender.


Current status of the project: Under construction

Key information of the project:

Role of Parhoon Tarh: Main contractor
Employer: Pakan Beh Shoo Company
Consultant: Zharf Andishan Consultant Engineers Company
Location: Khoramdasht Industrial City- Qazvin
Value of the project: 1,260 billion Rials
Length of the projects: 11 months

 

Project images

Volumes of the projects:

Concrete pouring: 16,000  m3
Armature: 1,000 tons
Concrete molds: 12,000  m2
Steel deck: 88 tons
Ceramic tiles: 22,000  m2
Sandwich panels: 48,000  m2

Technical descriptions of the project:

Production and liquid packaging building: 22,000  m2
Gel pod production and packaging building: 830  m2
Industrial liquids production and packaging building: 600  m2
Toothpaste production and packaging building: 2,400  m2
Sulfonation building: 4,700  m2
Product warehouse: 16,000  m2
Passage and power posts: 450  m2
Engine room: 1,100  m2
 

 

Goals of the project:

  • Construction of a detergent factory with annual capacity of 420,000 tons, including laundry detergents, dishwashing liquids, toothpaste, glass cleaner etc.
 

Astara Grain Terminal Construction

Astara Grain Terminal Construction

Construction and civil operations and installations of the Astara Grain Terminal in April 2019, from Astara Ghaleh Azari Company to Parhoon Tarh Company.

Astara Grain Terminal is being constructed with capacity of 30,000 tons at the primary phase and 30,000 tons in the second expansion phase, located at the Astara Customs Grand Complex with investments from I.R.I. Railways and private foreign investment (Russian-Azerbaijani firm).

Construction of all administrative, storage, station, loading and unloading, firefighting, respective concrete reservoir, trans and laboratory buildings, installation of 470 units of 25 meter candles, concrete foundation for silos, landscaping and greenery and among the executive operations of the project.


Current status of the project: Completed

Key information of the project:

Contractor: Collaboration between Parhoon Tarh- Tana Energy as chief contractor
Employer: Astara Ghaleh Azari Company
Consultant: Pasilo Consultant Engineers from Iran- INNOPRO Consultation from Azerbaijan
Location of the project: Mazandaran Province- City of Astara
Value of the contract: 3 million euros
Length of the contract: 31 months

 

Project images

Major volumes of the project:

Overall volume of concrete pouring: 20,000 cubic meters
Overall volume of soil works: 65,000 cubic meters
Armatures: 1,900
Concrete candles: 470 units with depth of 25 meters

 

Goals of the project:

  • Astara Grain Terminal was constructed based on the domestic need for increase of commerce and establishment of depots for imported grains at border regions.