post

Sanandaj Combined Cycle

Sanandaj Combined Cycle

Sanandaj combined cycle power plant located in 5th km of Sanandaj to Saghez road, is one the 22 combined cycle power plants planned to be constructed all over the country. All civil works of this project with the objective of power generation of 960 MW was completed by Parhoon Tarh Company. This project leads to altering Sanandaj with consumption of about 402 MW power at the peak time to a productive city rather than a consumer one.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: MAPNA Group
Consultant Engineer: Moshanir Co. as the Consulting Engineers & Ghods Niroo Co. as the supervisor
Location: Iran-Kurdistan Province
Project Cost: 20 million USD
Project Duration: 22 months

 

Featured Images

Project Volumes

Concrete Volume: 15,000 m3
Formwork: 34,000 m2
Reinforcement: 1,500 tons
Steel Structures: 2,150 tons
Sandwich Panel: 10,000 m2

Project Specification

Capacity: 960 MW
Number of Units: 4 gas units & 2 steam units
Capacity of Each Unit: 160 MW
Gas Turbines: Tuga V94.2

Project Goals

  • Power generation for supporting other cities

Project Stakeholders

post

Abadan Gas Power Plant

Abadan Gas Power Plant

Abadan refinery third power plant project, having installed capacity of 210 MW power generations, was completed by Parhoon Tarh Company. This company was responsible for execution of all related civil works of the project which was awarded by Farab co. as the client.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Farab Co.
Consultant Engineer: Mesinan Consulting Engineers
Location: Iran-Khuzestan Province
Project Cost: 20 million USD
Project Duration: 41 months

 

Featured Images

Project Volumes

Concrete Volume: 17,000 m3
Formwork: 32,000 m3
Reinforcement: 1,900 tons
Steel Structures: 3,200 tons
Sandwich Panel: 12,000 m2

Project Specification

Capacity: 210 MW
Number of Units: 7*30 MW gas units

Project Goals

  • Power production
  • Replacing old generators of Abadan refinery
  • Stability of oil production

Project Stakeholders

post

Aliabad Gas Power Plant

Aliabad Gas Power Plant

Aliabad Gas Power Plant is located in Golestan province in Iran. Execution of all civil works of this power plant was awarded to Parhoon Tarh Company due to its brilliant experience specially in construction of power plants.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: MAPNA Group
Consultant Engineer: Ghods Niroo Consulting Engineers
Location: Iran-Golestan Province
Project Cost: 25 million USD
Project Duration: 22 months

 

Featured Images

Project Volumes

Concrete Volume: 54,000 m3
Formwork: 100,000 m3
Reinforcement: 3,500 tons
Steel Works: 4,000 tons
Sandwich Panel: 20,000 m2

Project Specification

Capacity: 1000 MW
Number of Units: 6*162 gas units

Project Goals

  • Power production of 1000 MW by 6*162 MW units

Project Stakeholders

post

Seymareh Hydroelectric Plant

Seymareh Hydroelectric Plant

Seymareh dam & hydropower plant project is located on the Seymareh River in western Iran, 37 km from the city of Darreh Shahr in Ilam province. The surface power house, with an annual energy production of 595 GWhr, was awarded by the Iran Water and Power Development Company to the consortium of Farab-Tablieh-Parhoon Tarh as the EPC contractor of civil parts. The design works were carried out by the Swiss Firm Poyry as a subcontractor of Tablieh-Parhoon Tarh J.V.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Tablieh-Parhoon Tarh J.V.
Client: Iran Power and Water Development Company
Consultant Engineer: Mahab Ghods Consulting Engineers
Location: Iran-Ilam Province
Project Cost: 42 million USD
Project Duration: 103 months

 

Featured Images

Project Volumes

Open Air Excavation: 60,000 m3
Concrete Volume: 70,000 m3
Reinforcement: 3,500 tons
Formwork: 48,000 m2

Project Specification

Type of Power House: Surface
Power House Dimensions: L= 97.70 m, W= 51.65 m, H= 57.15 m
Number of Units: 3 vertical axes 160 MW Francis units

Project Goals

  • Production of 850 G WHr hydroelectric energy annually
  • Control of seymareh river flood
  • Regulating water flow to Karkheh dam
  • Supply of regional downstream water requirements

Project Stakeholders

post

Mes Sarcheshmeh WTP Diversion Dam & Pumping Station

Mes Sarcheshmeh WTP Diversion Dam & Pumping Station

Industrial water partial demand of Mes Sarcheshmeh complex persuaded client to plan the construction of a water treatment plant with capacity of 500 litr/s. Water transmission from Rafsanjan Shur River was executed by a diversion dam and related treatment system. This J.V was responsible for design, construction, operation and maintenance of all related civil and electromechanical works which fulfilled client satisfaction.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Parhoon Tarh-Tool Gostar-Alfasam J.V.
Client: National Iranian Copper Industries co.
Consultant Engineer: Jooyabnou Consulting Engineers
Location: Iran-Kerman Province
Project Cost: 15 million USD
Project Duration: 36 months

 

Featured Images

Project Volumes

Concrete Volume: 16,000 m3
Formwork: 38,000 m2
Earth Works: 90,000 m3

Project Specification

Capacity of WTP: 500 litr/s
Pumping Station: 2 units
Pipeline: 5 km (600 mm diam.)
Diversion Dam: 3 m Height & 25 m width

Project Goals

  • Environmental protection
  • Supplement of industrial water through treatment of Shur river water and industrial waste water

Project Stakeholders

post

Almar Afghanistan

Almaar Afghanistan

The contract of Almaar dam and irrigation network designing was signed in 2012 between Tedis company of Tajikistan (main contractor) and Arian Parhoon. Almaar project is 34 kilometers far Maimana city, Faryab province, Afghanistan. The project includes a 68-meter-high concrete gravity dam and irrigation network in an area of 4000 hectares.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Owner: Ministry of Water and Power in the Islamic Republic of Afghanistan
Client: Tedis (Tajikistan)
Location: Afghanistan, Faryab, Maimana
Project Cost: 1.55 million USD
Project Duration: 22 Months

 

Featured Images

Project Specification

Type of Dam: Gravity Dam
Length at the Crown: 350 m
Spillway: Free Spillway at the Crown
Drainage Network: 3995 Hectares

Project Goals

  • Providing water for downstream lands

Project Stakeholders