Yazd Farab Cooling Tower

Yazd Farab Cooling Tower

Parhoon Tarh has achieved a great success in executing cooling tower projects with climbing formworks. According to this success we have used the same method in executing Yazd Farab cooling tower project.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: MAPNA Group
Consultant Engineer: Ameran-Ofogh Consulting Engineers & Farab co. as the main consultant
Location: Iran-Yazd Province
Project Cost: 8.5 million USD
Project Duration: 14 Months

 

Featured Images

Project Volumes

Concrete Volume: 8,000 m3
Earth Works: 14,000 m3
Reinforcement: 3,000 tons
Formwork: 55,000 m2

Project Specification

Number of Towers: 1 Unit
Height from Foundation: 120 m
Maximum Diameter: 80 m
Thickness: Vary from 18 cm to 125 cm

Project Goals

  • Cooling the working fluid

Project Stakeholders

post

Sanandaj Cooling Towers

Sanandaj Cooling Towers

Because of Parhoon Tarh Co’s great performance in execution of Sanandaj combined cycle power plant and gaining employer’s satisfaction, the client decided to extend Parhoon Tarh’s responsibility by assigning the construction of two cooling towers. All civil works of the mentioned cooling towers with maximum height of 125 m were completed by this company implementing of climbing form working system.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: MAPNA Group
Consultant Engineer: Moshanir Co. as Consulting Engineers & Ghods Niroo Co. as the supervisor
Location: Iran-Kurdistan Province
Project Cost: 15 million USD
Project Duration: 18 months

 

Featured Images

Project Volumes

Number of Towers: 2 units
Height from Foundation: 125 m
Maximum Diameter: 73 m
Thickness: Vary from 18 cm to 125 cm

Project Goals

  • Cooling the working fluid

Project Stakeholders

post

Yazd Solar Thermal

Yazd Solar Thermal

Thanks to many sun-rich areas in Iran, there is high capacity of using solar energy. Yazd integrated solar combined cycle power station is a hybrid power station situated near Yazd, Iran which became operational in 2009. It is the world’s first combined cycle power plant using solar power and natural gas. This plant has capacity of 467 MW and uses solar energy in order to augment its steam generation by concentrating solar power technology.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Managing Contractor (MC)
Client: MAPNA Group
Consultant Engineer: Moshanir Consulting Engineers
Location: Iran-Yazd Province
Project Cost: 18 million USD
Project Duration: 40 months

 

Featured Images

Project Volumes

Concrete Volume: 31,000 m3
Formwork: 78,000 m2
Reinforcement: 3,300 tonss
Steel Works: 3,300 tons
Sandwich Panel: 20,500 m2

Project Specification

Capacity: 478 MW
Number of Units: 2*159 MW gas units (V94.2) Number of steam units: 1*143 steam unit
Capacity of Solar Unit: 3,300 tons
Steel Works: 17 MW

Project Goals

  • Developing and using clean energy, and making optimum use of the solar energy

Project Stakeholders

post

Rudeshur Simple Cycle

Rudeshur Simple Cycle

Constructing 1st phase of Rudshur power plant located at 44th Km of Tehran-Saveh free road, with a capacity of 792 MW, inaugurated in summer 2004 and operated in winter 2006. The most important technical specifications of these Power Plant units are high power generation amounting to 264 MW for each unit, availability rate over 92%, and efficiency rate around 39%. Besides, observing environmental standards with the aim of the green industry differentiate these units from the other similar ones. Parhoon Tarh Company was responsible for managing the project based on a MC contract.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Managing Contractor (MC)
Client: Arian Mahtab Gostar Co.
Consultant Engineer: Electrowatt Consulting Engineers as Designer & Wala Energy Co. as supervisor
Location: Iran-Markazi Province
The original contract amount: 208 million euros
Contract cost Parhoon Tarh: 10 billion rials
Project Duration: 30 months

 

Featured Images

Project Volumes

Capacity of 1st Phase: 789 MW
Capacity of all Phases: 2100 MW
Type of GTG Units: Siemens V 94.3.2a
Number of Units: 3 × 262.9 MW (1st Phase)

Project Goals

  • Considering annual growth of the national demand as well as the I.R.I policies to activate the private sector in supplying electricity
  • Rudeshur SCPP with a final capacity of 2,100 MW by 8 units completed by the private sector in an aim to make up the part of the national grid demand

Project Stakeholders

post

Neka Combined Cycle

Neka Combined Cycle

Neka combined cycle power plant located in northern city of Neka, was constructed with objective of 160 MW power generation by utilization of two gas units. This company as the leader of Parhoon Tarh-Ameran Ofogh-Niroo Tavan joint venture was responsible for design and construction of civil parts in this project. Improving the environmental conditions and promoting the efficiency are two other significant goals of this project.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Parhoon Tarh-Ameran Ofogh-Niroo Tavan J.V.
Client: MAPNA Group
Consultant Engineer: Monenco Consulting Engineers
Location: Iran-Mazandaran Province
Project Cost: 11 million USD
Project Duration: 31 months

 

Featured Images

Project Volumes

Excavation: 60,000 m3
Concrete Volume: 15,000 m3
Formwork: 16,000 m2
Reinforcement: 2,500 tons
Steel Works: 2,500 tons
Sandwich Panel: 10,000 m2

Project Specification

Capacity: 160 MW
Number of Units: 2 units
Capacity of Each Unit: 80 MW

Project Goals

  • Power generation & improving environmental conditions

Project Stakeholders

post

Sanandaj Combined Cycle

Sanandaj Combined Cycle

Sanandaj combined cycle power plant located in 5th km of Sanandaj to Saghez road, is one the 22 combined cycle power plants planned to be constructed all over the country. All civil works of this project with the objective of power generation of 960 MW was completed by Parhoon Tarh Company. This project leads to altering Sanandaj with consumption of about 402 MW power at the peak time to a productive city rather than a consumer one.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: MAPNA Group
Consultant Engineer: Moshanir Co. as the Consulting Engineers & Ghods Niroo Co. as the supervisor
Location: Iran-Kurdistan Province
Project Cost: 20 million USD
Project Duration: 22 months

 

Featured Images

Project Volumes

Concrete Volume: 15,000 m3
Formwork: 34,000 m2
Reinforcement: 1,500 tons
Steel Structures: 2,150 tons
Sandwich Panel: 10,000 m2

Project Specification

Capacity: 960 MW
Number of Units: 4 gas units & 2 steam units
Capacity of Each Unit: 160 MW
Gas Turbines: Tuga V94.2

Project Goals

  • Power generation for supporting other cities

Project Stakeholders

post

Abadan Gas Power Plant

Abadan Gas Power Plant

Abadan refinery third power plant project, having installed capacity of 210 MW power generations, was completed by Parhoon Tarh Company. This company was responsible for execution of all related civil works of the project which was awarded by Farab co. as the client.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Farab Co.
Consultant Engineer: Mesinan Consulting Engineers
Location: Iran-Khuzestan Province
Project Cost: 20 million USD
Project Duration: 41 months

 

Featured Images

Project Volumes

Concrete Volume: 17,000 m3
Formwork: 32,000 m3
Reinforcement: 1,900 tons
Steel Structures: 3,200 tons
Sandwich Panel: 12,000 m2

Project Specification

Capacity: 210 MW
Number of Units: 7*30 MW gas units

Project Goals

  • Power production
  • Replacing old generators of Abadan refinery
  • Stability of oil production

Project Stakeholders

post

Aliabad Gas Power Plant

Aliabad Gas Power Plant

Aliabad Gas Power Plant is located in Golestan province in Iran. Execution of all civil works of this power plant was awarded to Parhoon Tarh Company due to its brilliant experience specially in construction of power plants.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: MAPNA Group
Consultant Engineer: Ghods Niroo Consulting Engineers
Location: Iran-Golestan Province
Project Cost: 25 million USD
Project Duration: 22 months

 

Featured Images

Project Volumes

Concrete Volume: 54,000 m3
Formwork: 100,000 m3
Reinforcement: 3,500 tons
Steel Works: 4,000 tons
Sandwich Panel: 20,000 m2

Project Specification

Capacity: 1000 MW
Number of Units: 6*162 gas units

Project Goals

  • Power production of 1000 MW by 6*162 MW units

Project Stakeholders

post

Seymareh Hydroelectric Plant

Seymareh Hydroelectric Plant

Seymareh dam & hydropower plant project is located on the Seymareh River in western Iran, 37 km from the city of Darreh Shahr in Ilam province. The surface power house, with an annual energy production of 595 GWhr, was awarded by the Iran Water and Power Development Company to the consortium of Farab-Tablieh-Parhoon Tarh as the EPC contractor of civil parts. The design works were carried out by the Swiss Firm Poyry as a subcontractor of Tablieh-Parhoon Tarh J.V.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Tablieh-Parhoon Tarh J.V.
Client: Iran Power and Water Development Company
Consultant Engineer: Mahab Ghods Consulting Engineers
Location: Iran-Ilam Province
Project Cost: 42 million USD
Project Duration: 103 months

 

Featured Images

Project Volumes

Open Air Excavation: 60,000 m3
Concrete Volume: 70,000 m3
Reinforcement: 3,500 tons
Formwork: 48,000 m2

Project Specification

Type of Power House: Surface
Power House Dimensions: L= 97.70 m, W= 51.65 m, H= 57.15 m
Number of Units: 3 vertical axes 160 MW Francis units

Project Goals

  • Production of 850 G WHr hydroelectric energy annually
  • Control of seymareh river flood
  • Regulating water flow to Karkheh dam
  • Supply of regional downstream water requirements

Project Stakeholders

post

Mes Sarcheshmeh WTP Diversion Dam & Pumping Station

Mes Sarcheshmeh WTP Diversion Dam & Pumping Station

Industrial water partial demand of Mes Sarcheshmeh complex persuaded client to plan the construction of a water treatment plant with capacity of 500 litr/s. Water transmission from Rafsanjan Shur River was executed by a diversion dam and related treatment system. This J.V was responsible for design, construction, operation and maintenance of all related civil and electromechanical works which fulfilled client satisfaction.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Parhoon Tarh-Tool Gostar-Alfasam J.V.
Client: National Iranian Copper Industries co.
Consultant Engineer: Jooyabnou Consulting Engineers
Location: Iran-Kerman Province
Project Cost: 15 million USD
Project Duration: 36 months

 

Featured Images

Project Volumes

Concrete Volume: 16,000 m3
Formwork: 38,000 m2
Earth Works: 90,000 m3

Project Specification

Capacity of WTP: 500 litr/s
Pumping Station: 2 units
Pipeline: 5 km (600 mm diam.)
Diversion Dam: 3 m Height & 25 m width

Project Goals

  • Environmental protection
  • Supplement of industrial water through treatment of Shur river water and industrial waste water

Project Stakeholders