Shiraz Urban Railway Central Depot

Shiraz Urban Railway Central Depot

This central depot which is located in Shiraz city includes several buildings such as a view hall, a washing hall, an administration building, parking spaces, stores, power posts, etc. The whole work scopes of the contract including all civil, electrical, and mechanical activities were completely done by Parhoon Tarh Co. as the main contractor.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Shiraz Urban Railway Organization
Consultant Engineer: Itsen Consulting Engineers
Location: Iran-Fars Province
Project Cost: 7 million USD
Project Duration: 15 months

 

Featured Images

Project Volumes

Concrete Volume: 15,000 m3
Formwork: 20,000 m2
Reinforcement: 350 tons
Earth Works: 70,000 m3
Steel Works: 750 tons
Landscaping: 6,000 m2

Project Goals

  • Provision and extension of storage spaces for Shiraz railway project

Project Stakeholders

post

Isfahan Jaber Railway Station

Isfahan Jaber Railway Station

Jaber station as one of the main stations of Isfahan urban railway plan is situated in a space with some area about 4,000 m2. Architectural aspects of this station is designed in two floors including top floor as the ticket hall with equipment spaces and bottom floor in which platforms of stations and other equipment’s are located. Structure of this station is a combination of concrete wall in the bottom floor and a mat foundation where the top floor is executed on with a combination of concrete beams and columns. Parhoon Tarh Co., the main contractor, was responsible for execution of all civil, electrical, and mechanical works of the project.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Isfahan Urban Railway Organization
Consultant Engineer: Badband Consulting Engineers
Location: Iran-Isfahan Province
Project Cost: 7 million USD
Project Duration: 23 months

 

Featured Images

Project Volumes

Concrete Volume: 15,000 m3
Formwork: 25,000 m2
Reinforcement: 2,000 tons
Earth Works: 70,000 m3
Steel Works: 120 tons

Project Specification

Total Area: 7,000 m2
Method Statement: Open trenches excavation and provision of stability

Project Goals

  • Development of urban railway plans in Isfahan city regarding fundamental demands of public transformation

Project Stakeholders

post

Steam Part of “Kashan” Combined Cycle Power Plant

Steam Part of “Kashan” Combined Cycle Power Plant

“Kashan” Combined Cycle Power Plant, has been constructed in Kashan city, Esfahan province. Capacity of this power plant, being the supplier of a part of the overall network electricity of the country, is 324 MV, being supplied by operating two gas stations .The main owner of the project, is the Power Development Organization of Iran. Based on the approved strategy, Kashan Power Plant Project, has been implemented in form of 17 contracts in the engineering, equipment supply and execution sectors. Also the post capacity of Kashan Power Plant, is 230 Kilo volts, and the engineering, supply and construction thereof, is within the working scope of the project owner. The executive operations of Kashan Power Plant construction started on 23 Jan., 2008 and the first unit of the said power plant, entered the circuit on 27 June, 2009 (Synchron). The last unit of this power plant was provisionally delivered to the owner on 31 Jan., 2010. In the Kashan Gas Power Plant Construction Project, the record of minimum interval between the start of excavation of the hall turbine and the Synchron of the 1st unit, has been registered as a period of 14 months.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Contractor of all construction operations
Client: Mapna Group
Consultant Engineer: Ghods Niroo Consulting Engineers Company
Location: Esfahan Province
Project Cost: 530 billion Rials
Project Duration: 24 Months

 

Featured Images

Project Volumes

Concrete Work: 24456  m3
Excavation: 202006  m3
Formwork: 41781  m2
Reineforcement: 2243 T
Steel Structures: 191 T

Project Specification

Type of Power Plant: Combined cycle
Power Plant Capacity: 324 MV
Number of Units: 2 gas units, each 162 units

Project Goals

  • Power Generation & Improvement of Environmental Conditions

Project Stakeholders

post

Caspian Combined Cycles Power Plant

Caspian Combined Cycles Power Plant

Mazandaran Combined Cycle Power Plant has been constructed in Noshahr city at Mazandaran province. Capacity of this power plant which supplies a part of the overall electricity network of the country, is 450 MV, being supplied by operating one gas unit. The main owner of the project, is Mahtab Caspian Power Generation Company. All construction & installation operations related to Noshahr Power Plant, are carried out in form of 3 contracts: (1) construction & civil works of the project (2) installation of crane, metal structure and sandwich panel (3) purchase of goods & equipments. By construction of combined cycle units, while improving the environmental conditions, increase of the power plant’s efficiency also became possible. The main tasks of the execution part included all soil operations of the power plant site, all building works of the tankers, buildings and warehouses related to the main power plant buildings, performing all interring works, etc. Also the main works of the design & execution (including design, procurement, supply & execution) included all landscaping operations, filtration house, sewage system, office buildings as well as all mechanical & electrical operations related to air-conditioning system, fire extinguishing, procurement & installation of the cranes used in the site.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Contractor for complete execution of executive activities
Client: Energy Gostaran Motahed Co.
Consultant Engineer: Raz Ahang Co.
Location: Mazandaran Province
Project Cost(along with purchase & installation of cranes): 1,394 billion rials
Project Duration: 30 Months

 

Featured Images

Project Volumes

Concrete Work: 22507  m3
Excavation: 161,148  m3
Formwork: 45,104  m2
Reinforcement: 2,815 T
Sandwich Panel: 19,634  m2
Steel Structures: 2,464 T

Project Specification

Type of Power Plant: Combined cycle
Power Plant Capacity: 450 MV
Number of Units: 1 Gas Unit

Project Goals

  • Power Generation & Improvement of Environmental Conditions

Project Stakeholders

post

Yazd Farab Cooling Tower

Yazd Farab Cooling Tower

Parhoon Tarh has achieved a great success in executing cooling tower projects with climbing formworks. According to this success we have used the same method in executing Yazd Farab cooling tower project.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: MAPNA Group
Consultant Engineer: Ameran-Ofogh Consulting Engineers & Farab co. as the main consultant
Location: Iran-Yazd Province
Project Cost: 8.5 million USD
Project Duration: 14 Months

 

Featured Images

Project Volumes

Concrete Volume: 8,000 m3
Earth Works: 14,000 m3
Reinforcement: 3,000 tons
Formwork: 55,000 m2

Project Specification

Number of Towers: 1 Unit
Height from Foundation: 120 m
Maximum Diameter: 80 m
Thickness: Vary from 18 cm to 125 cm

Project Goals

  • Cooling the working fluid

Project Stakeholders

post

Sanandaj Cooling Towers

Sanandaj Cooling Towers

Because of Parhoon Tarh Co’s great performance in execution of Sanandaj combined cycle power plant and gaining employer’s satisfaction, the client decided to extend Parhoon Tarh’s responsibility by assigning the construction of two cooling towers. All civil works of the mentioned cooling towers with maximum height of 125 m were completed by this company implementing of climbing form working system.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: MAPNA Group
Consultant Engineer: Moshanir Co. as Consulting Engineers & Ghods Niroo Co. as the supervisor
Location: Iran-Kurdistan Province
Project Cost: 15 million USD
Project Duration: 18 months

 

Featured Images

Project Volumes

Number of Towers: 2 units
Height from Foundation: 125 m
Maximum Diameter: 73 m
Thickness: Vary from 18 cm to 125 cm

Project Goals

  • Cooling the working fluid

Project Stakeholders

post

Yazd Solar Thermal

Yazd Solar Thermal

Thanks to many sun-rich areas in Iran, there is high capacity of using solar energy. Yazd integrated solar combined cycle power station is a hybrid power station situated near Yazd, Iran which became operational in 2009. It is the world’s first combined cycle power plant using solar power and natural gas. This plant has capacity of 467 MW and uses solar energy in order to augment its steam generation by concentrating solar power technology.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Managing Contractor (MC)
Client: MAPNA Group
Consultant Engineer: Moshanir Consulting Engineers
Location: Iran-Yazd Province
Project Cost: 18 million USD
Project Duration: 40 months

 

Featured Images

Project Volumes

Concrete Volume: 31,000 m3
Formwork: 78,000 m2
Reinforcement: 3,300 tonss
Steel Works: 3,300 tons
Sandwich Panel: 20,500 m2

Project Specification

Capacity: 478 MW
Number of Units: 2*159 MW gas units (V94.2) Number of steam units: 1*143 steam unit
Capacity of Solar Unit: 3,300 tons
Steel Works: 17 MW

Project Goals

  • Developing and using clean energy, and making optimum use of the solar energy

Project Stakeholders

post

Rudeshur Simple Cycle

Rudeshur Simple Cycle

Constructing 1st phase of Rudshur power plant located at 44th Km of Tehran-Saveh free road, with a capacity of 792 MW, inaugurated in summer 2004 and operated in winter 2006. The most important technical specifications of these Power Plant units are high power generation amounting to 264 MW for each unit, availability rate over 92%, and efficiency rate around 39%. Besides, observing environmental standards with the aim of the green industry differentiate these units from the other similar ones. Parhoon Tarh Company was responsible for managing the project based on a MC contract.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Managing Contractor (MC)
Client: Arian Mahtab Gostar Co.
Consultant Engineer: Electrowatt Consulting Engineers as Designer & Wala Energy Co. as supervisor
Location: Iran-Markazi Province
The original contract amount: 208 million euros
Contract cost Parhoon Tarh: 10 billion rials
Project Duration: 30 months

 

Featured Images

Project Volumes

Capacity of 1st Phase: 789 MW
Capacity of all Phases: 2100 MW
Type of GTG Units: Siemens V 94.3.2a
Number of Units: 3 × 262.9 MW (1st Phase)

Project Goals

  • Considering annual growth of the national demand as well as the I.R.I policies to activate the private sector in supplying electricity
  • Rudeshur SCPP with a final capacity of 2,100 MW by 8 units completed by the private sector in an aim to make up the part of the national grid demand

Project Stakeholders

post

Neka Combined Cycle

Neka Combined Cycle

Neka combined cycle power plant located in northern city of Neka, was constructed with objective of 160 MW power generation by utilization of two gas units. This company as the leader of Parhoon Tarh-Ameran Ofogh-Niroo Tavan joint venture was responsible for design and construction of civil parts in this project. Improving the environmental conditions and promoting the efficiency are two other significant goals of this project.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Parhoon Tarh-Ameran Ofogh-Niroo Tavan J.V.
Client: MAPNA Group
Consultant Engineer: Monenco Consulting Engineers
Location: Iran-Mazandaran Province
Project Cost: 11 million USD
Project Duration: 31 months

 

Featured Images

Project Volumes

Excavation: 60,000 m3
Concrete Volume: 15,000 m3
Formwork: 16,000 m2
Reinforcement: 2,500 tons
Steel Works: 2,500 tons
Sandwich Panel: 10,000 m2

Project Specification

Capacity: 160 MW
Number of Units: 2 units
Capacity of Each Unit: 80 MW

Project Goals

  • Power generation & improving environmental conditions

Project Stakeholders

post

Sanandaj Combined Cycle

Sanandaj Combined Cycle

Sanandaj combined cycle power plant located in 5th km of Sanandaj to Saghez road, is one the 22 combined cycle power plants planned to be constructed all over the country. All civil works of this project with the objective of power generation of 960 MW was completed by Parhoon Tarh Company. This project leads to altering Sanandaj with consumption of about 402 MW power at the peak time to a productive city rather than a consumer one.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: MAPNA Group
Consultant Engineer: Moshanir Co. as the Consulting Engineers & Ghods Niroo Co. as the supervisor
Location: Iran-Kurdistan Province
Project Cost: 20 million USD
Project Duration: 22 months

 

Featured Images

Project Volumes

Concrete Volume: 15,000 m3
Formwork: 34,000 m2
Reinforcement: 1,500 tons
Steel Structures: 2,150 tons
Sandwich Panel: 10,000 m2

Project Specification

Capacity: 960 MW
Number of Units: 4 gas units & 2 steam units
Capacity of Each Unit: 160 MW
Gas Turbines: Tuga V94.2

Project Goals

  • Power generation for supporting other cities

Project Stakeholders