Isfahan 230 KV Cable Tunnel
Status of Project: Completed
Project Highlights
Role of Parhoon Tarh: EPC Contractor as member of Tablieh-Parhoon Tarh J.V.
Client: Isfahan Regional Power Company
Consultant Engineer: Farbar Consulting Engineers
Location: Iran-Isfahan Province
Project Cost: 27 Million Euro
Project Duration: 30 months

Featured Images
Project Volumes
Concrete Volume: 11,000 m3
Reinforcement & Steel Works: 1,200 tons
Formwork: 43,000 m2
Excavation: 40,000 m3
Project Specification
Length of Tunnel: 4.6 km
Tunnel outer Diameter: 3.00 m
Tunnel inner Diameter: 2.44 m
Project Goals
- Power transmission network of Isfahan
- Carrying 230 KV cables from the first Islam Abad power plant