Financing and Execution the Project aimed at Organizing Minab Dam Downstream River

Financing and Execution the Project aimed at Organizing Minab Dam Downstream River

Minab downstream River is one of the important rivers in Hormozgan Province, that floats in Minab plain, in approximately 120 kilometer distance from east Bandar Abbas. Minab Dam has been built to harness the flood and provide sustained drinking and agricultural water in Dasht Minab region, as well as for supplying drinking water in Bandar Abbas City. The goal of this project is to organize, dredge and control Minab river flood.

Status of Project: In Progress

Project Highlights

Role of Parhoon Tarh: Contractor of Construction Operations, and Site Building
Project investor: Tana Energy and Parhoon Tarh Joint Venture
Client: Hormozgan Regional Water Company
Consultant Engineer: Sabzab Arvand Consultant Engineers Company
Location: Hormozgan Province- Minab City
Project Cost:790 billion IRR
Project Duration: 12 months

 

Project images

Project Volumes

Concrete work: 46,000  m3
Excavation: 902,000  m3
Embankment: 803,000  m3
Geotextile: 156,000  m3
Stone structures: 183,000  m3

Project Specification

Length of the right dike of the river: 7,880 m
Length of the left dike of the river: 6,790 m
Height of the dike: 3.5m , 4.5m and 5.5 m
Concrete pipes: 700 to 1000 mm diameter
Type of operations: River organizing
 

Project Goals

  • Building soil dike in the planned dimensions by using geotextile filter materials, construction of gable surface and pebbles in cement mortar for non-urban areas in the right and left banks of the river
  • Dikes heels protection operations including digging canals and pebble mortar filling in designed dimensions in 2.5m length
  • The drilling, dredging operations, collecting and discharging surface waters in the dikes’ back, and construction of dike underpass structures to direct the dredged water into the river
  • Collecting river materials for dike construction, and clearing the path of the last area (the lowest stream in the area).
post

Industrial Buildings and Site Construction of Negin Mahestan Petrochemical Company

Industrial Buildings and Site Construction of Negin Mahestan Petrochemical Company

Negin Mahestan Kangan Petrochemical Company is located in approximately 20 Km southeast Kangan City in Tonbak Region, Boushher Province, between Cement Plant and phase 12 of Gas Field Development Plan of South pars Special Economic Zone, Kangan Petrochemical Complex. The project of Negin Mahestan Petrochemical Company includes supplying the necessary materials, and executing the civil development, site and access road buildings, construction of the foundation and concrete structures, industrial buildings consisting of three packaging building, extrusion, co-catalyst, and, electrical –electronic, and safety facilities related to it, subsurface piping system; and earthing system in both the heavy and linear light polyethylene production units.

Status of Project: In Progress

Project Highlights

Role of Parhoon Tarh: Contractor of Construction Operations and Site Building
Client: Negin Mahestan Kangan Petrochemical Company
Consultant Engineer: Sazehpardazi Iran Consultant Engineers
Location: Boushehr- Kangan
Project Cost: 2,570 billion IRR
Project Duration: 24 months

 

Project images

Project Volumes

Concrete work: 30,000  m3
Excavation: 95,000  m3
Formwork: 62,000  m2
Reinforcement: 3,600 tons
Steel structures: 200 tons
Embankment: 6,500  m3
Subsurface piping system: 29,000 m

Project Specification

Number of industrial buildings: Three buildings consisting of packing building, extrusion, co-catalyst and electrical facilities
Extrusion building: 2800  m2
Extrusion substation building: 650  m2
Additive storage and control room buildings: 400  m2
C-catalyst building: 260  m2
Packaging building: 3500  m2
 

Project Goals

  • Construction of industrial buildings, access roads, site building, underground/subsurface piping sytem….in the area of Negin Mahestan Petrochemical Company
post

Construction operations of concrete cooling tower of Latakia Combined Cycle Power Plant

Construction operations of concrete cooling tower of Latakia Combined Cycle Power Plant

Construction of 540 MW combined cycle power plant of Latakia. Due to the increase in electricity demand in Syria, the need to re-implement the industrial, agricultural, service and tourism sectors were put in the agenda. Performing the remaining construction operations of concrete cooling power of Latakia combined cycle power plant in Al-Rastan, next to Dam 16 Tishreen was put in the agenda of this project to provide the conditions for absorbing heat produced by the electricity generation operations.

Status of Project: In Progress

Project Highlights

Role of Parhoon Tarh Contractor of Construction Operations
ClientConstruction and development of MAPNA Combined Cycle Power Plant (Tosse 2)
Location Syria- Latakia
Project Cost 6 million Euro
Project Duration 15 months

 

Project images

Project Volumes

Concrete work: 13,000  m3
Excavation: 13,000  m3
Traditional Formwork: 4.600  m2<
Framing X-LEG column’s formwork: 5.200  m2
Shell Climbing frame: 46,000  m2
Upper ring formwork: 400  m2
Reinforcement: 4,000 tons
Steel structures: 320 tons
Embankment: 7,500  m3
Number of X-LEG column: 32

Project Specification

Number of cooling towers: One unit
Height of the towers from foundation: 134m
Maximum diameter: 83m
Thickness: 18 to 125cm

Project Goals

  • The cooling system of combined cycle power plant
post

Construction of Combined Cycle Power Plant of Mobarakeh Esfahan Steel Plant

Construction of Combined Cycle Power Plant of Mobarakeh Esfahan Steel Plant

To follow the policies set by the Minister of Energy and TAVANIR Company which aim at establishing private power plant projects in Iran to generate electricity for meeting the demands, the plan for building gas power plant in south Esfahan was launched. The average annual capacity of South Esfahan Power Plant is 5 million and 700 thousand MW/hour. The site of this project is in Esfahan Province, km 75 southwest road.

Status of Project: In Progress

Project Highlights

Role of Parhoon Tarh: Contractor of Construction Operations
Client: Construction and development of MAPNA Combined Cycle Power Plant (Tosse 3)
Location: Esfahan- Mobarakeh Steel Complex
Project Cost: 3,430 billion IRR
Contract duration: 14 months

 

Project images

Project Volumes

Concrete work: 35,000  m3 Excavation: 135,000  m3 Frormwork: 31,500  m2 Reinforcement: 3,100 tons Steel structures: 170 tons Embankment: 16,500  m3

Project Specification

Type of power plant: Combined Cycle
Power Plant Capacity: 914 MW
Number of units: Two gas units 307 MW and one steam unit, 300 MW
 

Project Goals

  • Improving power generation and helping environmental conditions
post

Construction Operations for Rehabilitating the Cooling System of Unit 5 Eslamabad Power Plant of Esfahan

Construction Operations for Rehabilitating the Cooling System of Unit 5 Eslamabad Power Plant of Esfahan

Isfahan’s IslamAbad power plant is located in a very favorable geographical location. It is located on the edge of ZayandehRood River and near the Qaemiyeh hills. This power plant is located in the southwest of Isfahan and at the beginning of Zob Ahan highway, with an area of approximately 74 hectares. Currently, Isfahan power plant is connected to the country’s national electricity grid with five steam units with a nominal power of 835 MW, including two 37.5 MW, one 120 MW and two 320 MW steam units. The Rehabilitating the cooling system of this power plant with a hybrid cooling system is constructed In Iran for the first time to absorb the heat of the work process, which is the one of the goals of this project.

Status of Project: In Progress

Project Highlights:

Role of Parhoon Tarh Contractor of Construction Operations and Site Building
Client:Construction and development of MAPNA Combined Cycle Power Plant (Tosse 1)
Location:Esfahan- Eslamabad
Project Cost: 1,390 billion IRR
Contract duration: 24 months

 

Project images:

Project Volumes:

Concrete work: 9,000 M3
Excavation: 50,000 M3
Rock clearing: 150,000 M3
Formwork: 25,000 M2
Reinforcement: 810 T
Steel structures: 220 T
Embankment: 41,000 M3

Project Specification:

The hybrid cooling tower is a simultaneous combination of a dry cooling tower and a wet cooling tower in one single system in which, the upper part is the dry part and the lower part contains the wet part. Using this cooling tower reduces evaporation, thus leading in the reducing of both water and electricity consumption. These towers are high and contain precise and exact piping system.  

Project Goals:

  • To build the first hybrid cooling in Iran in Eslamabad Power Plant of Esfahan to absorb the heat in the work process
 
 
post

Access Road to Seymareh

Access Road to Seymareh

The scope of works for this contract includes all civil and related tasks in order to construct the access road of the Seymareh hydro power plant.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Tablieh-Parhoon Tarh J.V.
Client: Iran Power and Water Development Company
Consultant Engineer: Mahab Ghods Consulting Engineers
Location: Iran-Ilam Province
Project Cost: 15 million USD
Project Duration: 20 months

 

Featured Images

Project Volumes

Embankment: 300,000 m3
Excavation: 1,200,000 m3 (In Rock)
Masonry: 30,000 m3

Project Specification

Length of Road: 10.7 km
Width of Road: 15 m
Bridges & Walls: 30 Nos.

Project Goals

  • Providing the possibility of accessing to the main site of the Seymareh Hydropower plant

Project Stakeholders

post

Isfahan 230 KV Cable Tunnel

Isfahan 230 KV Cable Tunnel

Description of ProjectThe contract of this project consists of designing and construction of 230 KV cable tunnel located between Isfahan university and Taleghani post with total length of 4,600 m. Designing and construction of this project includes tunnel construction with ventilation shaft of inauguration time, procurement, delivery, erection and operation of the electrical and mechanical equipment’s of inauguration time that will be done by contractor. It was concluded to implement a TBM due to high speed and great performance of this machine, critical location of the project in addition to traffic congestion problems. Parhoon Tarh Co. is responsible for all related works in a framework of an EPC contract, which was awarded to Tablieh-Parhoon Tarh J.V.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Tablieh-Parhoon Tarh J.V.
Client: Isfahan Regional Power Company
Consultant Engineer: Farbar Consulting Engineers
Location: Iran-Isfahan Province
Project Cost: 27 Million Euro
Project Duration: 30 months

 

Featured Images

Project Volumes

Concrete Volume: 11,000 m3
Reinforcement & Steel Works: 1,200 tons
Formwork: 43,000 m2
Excavation: 40,000 m3

Project Specification

Length of Tunnel: 4.6 km
Tunnel outer Diameter: 3.00 m
Tunnel inner Diameter: 2.44 m

Project Goals

  • Power transmission network of Isfahan
  • Carrying 230 KV cables from the first Islam Abad power plant

Project Stakeholders

post

Malard Residential Complex

Malard Residential Complex

Malard residential complex project is located in a land with area of 76,000 m2 on the opposite side of Malard municipality. First phase of this complex is designed in 6 diverse blocks. This company as an EPC contractor has utilized tunnel form working system for its high speed performance in order to industrialize the concrete frame of residential buildings. In this method, the load bearing shear walls of each story are poured simultaneously with the roof of the floor. High speed and easy performance are the major benefits of this method in comparison with classic ones. Parhoon Tarh Co. is responsible for architectural and structural design as well as execution of all civil, mechanical, and electrical works.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor
Client: Omran & Maskan Sazeh Paydar (Mehr Derakhshan) Co.
Consultant Engineer: Ateck & Tavan J.V.
Location: Iran-Alborz Province
Project Cost: 65 million USD
Project Duration: 22 months

 

Featured Images

Project Volumes

Concrete Volume: 80,000 m3
Reinforcement: 7,000 tons
Formwork: 492,000 m2

Project Specification

Total Area of Buildings: 140,000 m2
Capacity: 1272 units
Number of Blocks: 25
Number of Floors: 5 to 11

Project Goals

  • Provision of living accommodation

Project Stakeholders

post

Seymareh Hydroelectric Plant

Seymareh Hydroelectric Plant

Seymareh dam & hydropower plant project is located on the Seymareh River in western Iran, 37 km from the city of Darreh Shahr in Ilam province. The surface power house, with an annual energy production of 595 GWhr, was awarded by the Iran Water and Power Development Company to the consortium of Farab-Tablieh-Parhoon Tarh as the EPC contractor of civil parts. The design works were carried out by the Swiss Firm Poyry as a subcontractor of Tablieh-Parhoon Tarh J.V.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Tablieh-Parhoon Tarh J.V.
Client: Iran Power and Water Development Company
Consultant Engineer: Mahab Ghods Consulting Engineers
Location: Iran-Ilam Province
Project Cost: 42 million USD
Project Duration: 103 months

 

Featured Images

Project Volumes

Open Air Excavation: 60,000 m3
Concrete Volume: 70,000 m3
Reinforcement: 3,500 tons
Formwork: 48,000 m2

Project Specification

Type of Power House: Surface
Power House Dimensions: L= 97.70 m, W= 51.65 m, H= 57.15 m
Number of Units: 3 vertical axes 160 MW Francis units

Project Goals

  • Production of 850 G WHr hydroelectric energy annually
  • Control of seymareh river flood
  • Regulating water flow to Karkheh dam
  • Supply of regional downstream water requirements

Project Stakeholders

post

Mes Sarcheshmeh WTP Diversion Dam & Pumping Station

Mes Sarcheshmeh WTP Diversion Dam & Pumping Station

Industrial water partial demand of Mes Sarcheshmeh complex persuaded client to plan the construction of a water treatment plant with capacity of 500 litr/s. Water transmission from Rafsanjan Shur River was executed by a diversion dam and related treatment system. This J.V was responsible for design, construction, operation and maintenance of all related civil and electromechanical works which fulfilled client satisfaction.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Parhoon Tarh-Tool Gostar-Alfasam J.V.
Client: National Iranian Copper Industries co.
Consultant Engineer: Jooyabnou Consulting Engineers
Location: Iran-Kerman Province
Project Cost: 15 million USD
Project Duration: 36 months

 

Featured Images

Project Volumes

Concrete Volume: 16,000 m3
Formwork: 38,000 m2
Earth Works: 90,000 m3

Project Specification

Capacity of WTP: 500 litr/s
Pumping Station: 2 units
Pipeline: 5 km (600 mm diam.)
Diversion Dam: 3 m Height & 25 m width

Project Goals

  • Environmental protection
  • Supplement of industrial water through treatment of Shur river water and industrial waste water

Project Stakeholders