Shah Wa Arous Dam

Shah Wa Arous Dam

The main constraint on developing sustainable large scale agriculture in Afghanistan is inadequate water resource, although total water availability is substantial annually. Therefore, development and regulation of the rivers & streams are necessary in order to facilitate water supply throughout the year, mitigate flood damages, generate hydro-power, domestic supply, etc. Shah-Wa-Arus multipurpose Project is one of the suitable projects based on performed prefeasibility & feasibility studies.


Status of Project: In Progress

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Tablieh-Parhoon Tarh J.V.
Client: Afghanistan-Ministry Of Energy & Water
Consultant Engineer: Alborz Sazeh Consultant Engineers
Location: Afghanistan-Kabul
Project Cost: 48 million USD
Project Duration: 42 months initial contract period + 730 days extension

 

Featured Images

Project Volumes

Dam Concrete Volume: 333,000  m3
Excavation Volume in Rock: 80,000  m3
Access Road Length: 6 km

Project Specification

Type of Dam: RCC (Roller Compacted Concrete)
Dam Crest Length: 303 m
Type of Spillway: Free Spillway on Dam Crest
Annual Production: 3.60 GWH/year

Project Goals

  • Agricultural land extension of 2,800 hectares Flood control and prevention of resulting damages | Power production of 1.2 MW
  • Increasing the groundwater level

Project Stakeholders

post

Civil Works For Navard Varagh Ahvaz

Civil Works For Navard Varagh Ahvaz

Ahvaz Navard Varagh project as an industrial project is located in 10th kilometer of Ahvaz-Bandere Imam Khomeini road. Construction of 4th part of foundations as well as execution of required concrete structures for machinery and equipment’s of the project was awarded to this company as the winner of a tender. All mentioned scopes of works as responsibilities of Parhoon Tarh Co. totally completed in May 2008.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: Khuzestan Foolad Oxin Co.
Consultant: Fanavar Sanat Madan Consulting Engineers
Location: Iran-Khuzestan Province
Project Cost: 4 million USD
Project Duration: 10 months

 

Featured Images

Project Volumes

Concrete Volume: 12,000 m3
Formwork: 17,000 m2
Reinforcement: 1,200 tons
Steel Works: 90 tons

Project Specification

Total Area: 9,000 m2

Project Goals

  • Construction of required concrete & steel structures for machinery & equipment’s

Project Stakeholders

post

Rais Ali Delvari Dam

Rais Ali Delvari Dam

Rais Ali Delvari dam had been constructed on Shapur river, 73 km to north of Bushehr. This project with objectives of water regulation, irrigation, flood control and, power generation was managed by this company.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Managing Contractor
Client: Fars Regional Water Company
Consultant Engineer: Mahab Ghods Consulting Engineers
Location: Iran- Bushehr Province
Main Contract: 35 million USD
Parhoon Tarh Portion: 1 million USD
Project Duration: 46 months

 

Featured Images

Project Volumes

Dam Concrete for Dam Structure: 220,000  m3
Concrete for Spillway: 30,000  m3
Drilling and Grouting: 100,000 m (Curtain wall)

Project Specification

Type of Dam: Double Arc Concrete
Length at Crown: 240 m
Height from Base: 112 m

Project Goals

  • Agricultural land extension of 19,500 hectares
  • Flood control and prevention of resulting damages
  • Energy production of 96 GWH

Project Stakeholders

post

Decentralized industrial buildings phase 13 and fire department building

South Pars 13th Phase Industrial Buildings

13th phase of South Pars with objective of gas extraction for about 2 billion cubic foot is considered as a natural gas condensate field which is located in the Persian Gulf. This project includes design control, material procurement, and construction of decentralized industrial buildings. Moreover, installation of all related equipment’s is another responsibility of this company.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Client: P.P.I (Petro Paidar Iranian) Co.
Consultant Engineer: P.P.I (Petro Paidar Iranian) Co.
Location: Iran-Bushehr Province
Project Cost: 23 million USD
Project Duration: 18 months

 

Featured Images

Project Volumes

Concrete Volume: 37,000 m3
Formwork: 120,000 m2
Reinforcement: 4,500 tons
Earth Works: 52,000 m3

Project Specification

Industrial Buildings: 30,000 m2 including 10 substations, 1 firefighting, 1 switchgear room, and 1 view gallery

Project Goals

  • Provision of demanded power for different units of south Pars refinery
  • Controlling & processing of existing units in the refinery

Project Stakeholders

post

PGSOC Refinery

Persian Gulf Gas Condensate Refinery

Bandar Abbas gas condensate refinery is constructed in the southern port city of Bandar Abbas with the objective of producing about 35 million liters of gasoline derived from South Pars gas field. The completion of this refinery will make Iran self-sufficient in gasoline production, and may even provide some export capacity for the country. Parhoon Tarh Company was responsible for execution of civil works required for the industrial buildings in the refinery as an EPC package in Tablieh-Parhoon Tarh J.V.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Tablieh-Parhoon Tarh J.V.
Client: Tehran Jonoob-Bina J.V.
Consultant Engineer: Bina Co.
Location: Iran-Hormozgan Province
Project Cost: 65 million USD
Project Duration: 24 months

 

Featured Images

Project Volumes

Concrete Volume: 80,000 m3
Formwork: 250,000 m2
Reinforcement: 12,000 tons
Excavation: 160,000 m3
Steel Works: 500 tons

Project Specification

Industrial Buildings: 85,000 m2

Project Goals

  • Provision of demanded power for different units of Bandar Abbas refinery
  • Controlling & processing of existing units in the refinery

Project Stakeholders