Shah Wa Arous Dam
Status of Project: In Progress
Project Highlights
Role of Parhoon Tarh: EPC Contractor as member of Tablieh-Parhoon Tarh J.V.
Client: Afghanistan-Ministry Of Energy & Water
Consultant Engineer: Alborz Sazeh Consultant Engineers
Location: Afghanistan-Kabul
Project Cost: 48 million USD
Project Duration: 42 months initial contract period + 730 days extension

Featured Images
Project Volumes
Dam Concrete Volume: 333,000 m3
Excavation Volume in Rock: 80,000 m3
Access Road Length: 6 km
Project Specification
Type of Dam: RCC (Roller Compacted Concrete)
Dam Crest Length: 303 m
Type of Spillway: Free Spillway on Dam Crest
Annual Production: 3.60 GWH/year
Project Goals
- Agricultural land extension of 2,800 hectares Flood control and prevention of resulting damages | Power production of 1.2 MW
- Increasing the groundwater level